Electrical permit: Removal and replacement of existing HVAC Systems serving Primary Date Center and the...
Removal and replacement of existing HVAC Systems serving Primary Date Center and the Einstein Lab of VBCPS Admin Bldg.
A weekly public scan of Hampton Roads data-center, subsea-cable, fiber, utility, industrial-power, permitting, and digital-infrastructure signals.
Removal and replacement of existing HVAC Systems serving Primary Date Center and the Einstein Lab of VBCPS Admin Bldg.
Removal and replacement of existing HVAC Systems serving Primary Date Center and the Einstein Lab of VBCPS Admin Bldg.
Low Voltage - installing a 5G WiFi cradlepoint on the roof on a small metal stand with 2 data lines and a ground wire ran to it.
remove existing lighting replace with 24 volt systemadd lighting in storage closet adding 3 outlets in ceiling 2 outlets in new wall and tv outlet on altar. One outlet for low voltage control box in equipment room
Upgrading the 200 amp service to 400 amps single phase and wiring for (16) computer servers and (2) mini split HVAC systems.
EXTERIOR ALTERATION - GENERATOR PAD EXISTING PUMP STATION / USE GROUP - U / NO CHANGE TO OCCUPANCY
Internal Hard Drives & Drive Bay Storage Server Combined Synopsis/Solicitation
Digital Lens Generator Combined Synopsis/Solicitation
Both tiers come from the same weekly scan. The difference is whether you spend your own hours working out which signals matter to your business — or start from a ranked readout where that work is done.
Want this matched to your firm, or every week without re-ordering? See the three ways to buy →