A weekly public scan of Hampton Roads data-center, subsea-cable, fiber, utility, industrial-power, permitting, and digital-infrastructure signals.
permit / construction signal
Active
high confidence
Electrical permit: Removal and replacement of existing HVAC Systems serving Primary Date Center and the...
Removal and replacement of existing HVAC Systems serving Primary Date Center and the Einstein Lab of VBCPS Admin Bldg.
Virginia Beach Permits · Virginia Beach · broad timing: 2026/02/02
permit / construction signal
Active
high confidence
Mechanical permit: Removal and replacement of existing HVAC Systems serving Primary Date Center and the...
Removal and replacement of existing HVAC Systems serving Primary Date Center and the Einstein Lab of VBCPS Admin Bldg.
Virginia Beach Permits · Virginia Beach · broad timing: 2026/01/26
public procurement opportunity
Combined Synopsis/Solicitation
high confidence
Internal Hard Drives & Drive Bay Storage Server
Internal Hard Drives & Drive Bay Storage Server Combined Synopsis/Solicitation
Federal buyer · Virginia 23681 · broad timing: 2026-08-03T12:00:00+00:00
permit / construction signal
Void
high confidence
Electrical permit: Low Voltage - installing a 5G WiFi cradlepoint on the roof on a small metal stand...
Low Voltage - installing a 5G WiFi cradlepoint on the roof on a small metal stand with 2 data lines and a ground wire ran to it.
Virginia Beach Permits · Virginia Beach · broad timing: 2026/02/17
permit / construction signal
Final
high confidence
Electrical permit: remove existing lighting replace with 24 volt systemadd lighting in storage closet...
remove existing lighting replace with 24 volt systemadd lighting in storage closet adding 3 outlets in ceiling 2 outlets in new wall and tv outlet on altar. One outlet for low voltage control box in equipment room
Virginia Beach Permits · Virginia Beach · broad timing: 2026/03/04
permit / construction signal
Final
high confidence
Electrical permit: Upgrading the 200 amp service to 400 amps single phase and wiring for (16) computer...
Upgrading the 200 amp service to 400 amps single phase and wiring for (16) computer servers and (2) mini split HVAC systems.
Virginia Beach Permits · Virginia Beach · broad timing: 2026/05/12
public procurement opportunity
Combined Synopsis/Solicitation
high confidence
Digital Lens Generator
Digital Lens Generator Combined Synopsis/Solicitation
Federal buyer · Virginia 23691 · broad timing: 2026-07-31T16:00:00+00:00
permit / construction signal
Active
high confidence
Building permit: EXTERIOR ALTERATION - GENERATOR PAD EXISTING PUMP STATION / USE GROUP - U / NO CHANGE...
EXTERIOR ALTERATION - GENERATOR PAD EXISTING PUMP STATION / USE GROUP - U / NO CHANGE TO OCCUPANCY
Virginia Beach Permits · Virginia Beach · broad timing: 2026/02/25